Dockside Green

On-site Reclaimed Water Treatment

Dockside Green's innovative approach to conserving and reusing water will save approximately 70 million gallons per year; the same amount used in the Greater Victoria area on the year's driest day.

One hundred percent of Dockside Green's sewage will be treated on-site and reused primarily for toilets and irrigation, reducing the demand for potable water. Residual treated water will recharge the naturalized waterway that flows across the site and collects rainwater as it flows towards the inner harbour.

Water Reuse Process - CHECK OUT THE WATER TREATMENT ANIMATION

imgThumb-Treatment-PlantDockside Green's treatment plant will blend in with the naturalized setting of the community and will be constructed under the greenway.

Read about the Case Study done by General Electric.

Next

All visuals are representative only. The Developer reserves the right to modify the building design, floor plans, prices, suite features and specifications. The Developer also reserves the right to alter, add to, or choose not to proceed with any amenities.